WLAN Planner supports batch export when managing projects, and can export up to 10 records at a time
- A . True
- B . False
In a WLAN network, when the AP’s transmit power is 100mW, how many dBm is equivalent?
- A . 20
- B . 1
- C . 30
- D . 10
In the VRRP hot backup scenario, the notification message between the active and standby WACs is not communicated, resulting in the standby WAC being unable to upgrade to the active WAC. The possible reason is that STP is enabled on the switch. You need to disable STP on the switch.
- A . True
- B . False
In a WLAN network, management messages must be forwarded using a CAPWAP tunnel, while service data messages can be forwarded through a CAPWAP tunnel or direct forwarding.
- A . True
- B . False
In a WDS point-to-point network, the backbone link between the Root AP and the Leaf AP uses the 5GHz frequency band for connection. The frequency band used by the Root AP is 149. Then the Leaf AP needs to use the following () frequency band
- A . 149
When delivering a WLAN project, if professional area planning design is not carried out in the early stage, you may face rework operations such as reinstalling APs and laying cables after the construction is completed.
- A . True
- B . False
The acceptance index of WLAN capacity design is to ensure that the bandwidth of key services can meet the needs of concurrent users in the target area.
- A . True
- B . False
The maximum number of layers supported by the location topology in Huawei eSight network management is () layers
- A . 10
A company has multiple APs in its WLAN network, which are centrally managed by a WAC. To facilitate users to access the wireless network, the company sets the SSID of the APs to the same name, but some APs will have a high load. In view of the above scenario, the company can use the load balancing function to balance the load of APs in the WLAN network and fully guarantee the bandwidth of each user.
- A . True
- B . False
When an engineer was conducting an on-site survey at a shopping mall, he found that a wall was covered with film. Therefore, the engineer could not estimate the attenuation according to common walls. At this time, the engineer should use the obstacle attenuation test method to conduct on-site testing to evaluate the actual signal attenuation of the wall.
- A . True
- B . False