Huawei H13-211_V3.0-ENU Übungsprüfungen
Zuletzt aktualisiert am 05.05.2025- Prüfungscode: H13-211_V3.0-ENU
- Prüfungsname: HCIA-Computing V3.0
- Zertifizierungsanbieter: Huawei
- Zuletzt aktualisiert am: 05.05.2025
If you want to modify the epg template that has been launched, which of the following server directories are mainly involved? (Multiple choice)
- A . Frame package on the service provider’s FTP library
- B . Frame package in the temporary directory of the SMS platform
- C . Frame packet of each epg,
- D . frame package in the temporary directory of the scp platform
In the eService solution, which one is not an interface used during the deployment of the system?
- A . Through the RPC interface
- B . Through HTTPS interface
- C . Via Email interface
Management software is layered and can be divided into three layers. Which of the following two layers are the most important?
- A . Server stand-alone management software and infrastructure management system
- B . Integrated network management system and stand-alone server management software
- C . Infrastructure management system and network management system
During the installation and deployment of a certain business, Engineer A is responsible for the server hardware installation. Engineer A does not need to ensure the completion of ()
- A . Verify operating system and driver compatibility
- B . Marking the equipment for identification
- C . Warm air can flow through the front baffle
- D . Determine correct power requirements
An application consumes a lot of IO resources. In order to improve the application’s read and write performance, what adjustments should be made to the system parameters?
- A . vm.swapiness = 0
- B . vm.swapiness=100
- C . vm.dirty_bACkgroundrADio=5
- D . vm.dirty_bACkgroundrADio=20
When making a summary design plan, customer business needs can be collected through on-site interviews, workshop technical exchanges, etc.
- A . True
- B . False
Which of the following semi-custom chips solves the shortcomings of custom circuits and overcomes the shortcomings of the limited number of gate circuits of the original programmable device?
- A . FPGA
- B . CPU
- C . GPU
- D . ASIC
Which of the following is not a feature of iBMC?
- A . Manage hardware virtualization functions
- B . Fault diagnosis and management
- C . Virtual KVN and Virtual Media
- D . Rich management interface
When an engineer was installing and deploying the Taishan_200 server, he saw several safety signs as shown in the figure below. Please drag the correct sign name to the corresponding symbol number.
The process of engineering survey is: survey preparation > site survey > engineering site preparation coordination meeting > first installation environment inspection > survey report preparation
- A . TRUE
- B . FALSE