Huawei H19-105_V2.0-ENU Übungsprüfungen
Zuletzt aktualisiert am 02.07.2025 - Prüfungscode: H19-105_V2.0-ENU
- Prüfungsname: HCSA-Sales-Data Center Facility V2.0
- Zertifizierungsanbieter: Huawei
- Zuletzt aktualisiert am: 02.07.2025
The fan control methods supported by NetCo18000-C series room-level chilled water intelligent temperature control products are (). (Multiple choice)
- A . Return air control
- B . Pressure Control
- C . Air Mixing Control
- D . Differential pressure control
- E . Air supply control
UPS5000-E only needs to be equipped with () to easily realize N+X power supply system. The operation is simple and convenient.
- A . BSC control panel
- B . Parallel Cable
- C . Parallel Card
- D . BSC cable
NetEco management system combines the operation and maintenance experience of Huawei I and process department and launches the electronic remote maintenance module to help operation and maintenance personnel complete daily operation and inspection of the equipment room. Which of the following functions can be achieved? (Multiple choice)
- A . Support the formulation of inspection plans and tracking of inspection progress
- B . Supports customized inspection content and inspection route
- C . With the help of mobile APP, automatically receive inspection tasks and record the inspection process.
- D . Support the generation of machine room inspection reports
Water-cooled air conditioners and chilled water air conditioners are the same refrigeration system
- A . True
- B . False
Huawei air-cooled air conditioner (35kw and 46kw) one indoor unit corresponds to one outdoor unit.
- A . True
- B . False
No need to charge refrigerant on site for FusionModule800 pipes within 30m.
- A . True
- B . False
The NetEco6000 management system can manage devices inside and outside the FusionModule micromodule at the same time. In the default recommended solution, devices inside the FusionModule micromodule use () collectors to access the devices, and devices outside the micromodule use () collectors to access the devices.
- A . ECC500, ECC500
- B . ECC500, ECC800
- C . ECC800, ECC500
- D . ECC800, ECC800
Which of the following tasks does data center operation and maintenance include? (Multiple choice)
- A . Real-time monitoring
- B . Routine Maintenance
- C . Major overhaul
- D . Emergency Drills
A project requires the management system to access two third-party generator sets (same model), one ATS (same model), six precision air conditioners (same model), and five smart meters (same model). The management system needs to report () third-party equipment access fees.
- A . 3
- B . 10
- C . 14
- D . None of the above
Which of the following statements about the controller (ECC800) of Fusionmodule2000 is incorrect?
- A . ECC800 can realize SMS alarm function
- B . ECC800 can realize voice alarm function
- C . ECC800 has two models: one with 3G/4G function and one without 3G/4G function
- D . ECC800 supports email alarm function.