Which of the following functions require corresponding hardware support? (Multiple choice)
- A . Power distribution link.
- B . Battery Management
- C . U-position self-identification
- D . Temperature cloud map
What are the i3 features of FusionModule2000 V3.0? (Multiple choice)
- A . iPower
- B . iCooling
- C . iManager
The asset management in the NetEco management system can manage the asset information of which of the following devices to achieve asset life cycle management? (Multiple choice)
- A . UPS
- B . Air conditioning
- C . Power distribution cabinet
- D . Server
In Fusionmodule2000, you can manually configure the linkage strategy of each subsystem.
- A . True
- B . False
Neteco supports centralized management of multiple data centers.
- A . True
- B . False
What are the functions of a multifunctional sensor? (Multiple choice)
- A . Smoke
- B . Temperature and humidity detection
- C . Infrared light detection
When the NetEco management system is sold in the market, which of the following situations does not require submitting RM to the management system RAT for decision-making?
- A . When there is a need to access third-party equipment in the project.
- B . When the project requires non-standard function customization and existing products cannot meet the requirements.
- C . When selling matching FusionModule products
- D . When the network management of a large DC project is sold separately.
The FusionModule500 & FusionModule800 air conditioner is connected to the back end of UPS.
- A . True
- B . False
What power input mode does FusionModule800 support?
- A . Single or dual
- B . Dual-channel
- C . Single channel
Which model is the row-level air conditioner of Fusionmodule2000?
- A . PDU8000