Question #141
When deploying an active-active solution for FC networking, over what distance is additional transmission equipment required to ensure interconnection between the two data centers?
- A . 100km
- B . 300km
- C . 50 km
- D . 25 km
Question #142
Regarding the description of the WLAN network planning solution for the one-to-two scenario of a dormitory/hotel with a bathroom at the door, the correct one is ().
- A . Select the butterfly wing wave AP wall-mounted installation in the bathroom corner, with a height of 2.2~2.5m. A single AP covers the left and right rooms.
- B . The AP fixes the radio frequency power and configures the maximum EIRP value to improve downlink coverage in the wall-through room. The worst 5G downlink RSSI is -65dBm, and the worst uplink RSSI is -80dBm.
- C . Separately deploy indoor omnidirectional APs (2*2 models such as 5761-11) in the corridor to ensure roaming continuity. The bathroom relies on 5G for coverage and turns off 2.4G.
- D . The bathroom relies on 5G for coverage and turns off 2.4G