You have been carefully monitoring the progress of testing for your project. You have been using the established traceability to verify that the requirements and test conditions are being adequately addressed. The test team is proceeding well in their test case execution and you can see that you are achieving about 80% coverage of the test conditions per the traceability mapping in your test management system. You have seen a number of defects being logged against test conditions that are failing, but you do not see a mapping of the test cases to those conditions.
What is likely to be occurring in the testing area that is causing the traceability to break down? [2]
- A . The test cases are mapped to the test strategy and are bypassing the test conditions.
- B . The testers are running exploratory tests that are not mapped to the test conditions.
- C . The testers are executing the wrong tests.
- D . The testers are not updating the test execution information in the test management system.
You are the manager of a test team. You inherited most of these people from a previous manager who promoted technical skills, particularly programming skills. As a result, your people are very strong in test automation skills, white box testing and complex test design techniques. You have just been told that you can hire five new people. You want the new people to complement the existing skill sets and you want to be sure the team will have a strong mutual respect.
Given the following options, who should you hire? [3]
- A . Hire all black box testers because you are severely lacking in that skill set.
- B . Hire customer support people who have experience with the customer interface.
- C . Hire a mix of people with strong testing and domain skills.
- D . Hire college interns who can be trained by the existing people.
You are the Test Manager for a software house (SoftTech), who provide a core banking product to retail banks around the world to enable their customers to process payments via the Internet and telephone banking.
Your current project is to integrate SoftTech’s core banking product with Welsh Bank’s existing bank systems. However, Welsh Bank’s systems are maintained by experienced developers and are poorly documented.
Welsh Bank has stated that this project must comply with Financial Conduct Authority (FCA)
regulatory banking standards.
A specification for the 10 interfaces to Welsh Bank’s existing systems has been produced by SoftTech’s development team.
You have been asked to plan and conduct reviews for the system integration and support documentation of all the systems.
Which of the following is the BEST approach for this project? SELECT ONE OPTION
- A . Conduct Inspections to verify that all documentation conforms to a set standard.
- B . Conduct a management review to assess progress of the integration features.
- C . Conduct an audit to verify that all test deliverables have been produced and signed off.
- D . Conduct an informal review of the integration documentation before the systems are integrated.
Following identification of a number of costly system performance failures late in the development lifecycle, your organisation has introduced a more rigorous review process for system design documents and source code to enhance phase containment. There will be subsequent checks to see if the improved review process detects/prevents these types of performance defects which are likely to have the highest impact on the technical behavior of the system. You have been tasked with evaluating the current defect management tool that will be used to support the reviews and dynamic testing, to ensure that the correct defect data attributes will be captured to enable these checks to be done.
Which three of the following attributes would be MOST effective?
a) Phase of introduction
b) Severity
c) Steps to reproduce the failure
d) Resolution details
e) Phase of detection
SELECT ONE OPTION
- A . a, b and e.
- B . a, b and c.
- C . b. c and d.
- D . b, d and e.
Which one of the following metrics would be MOST suitable for helping to determine whether test analysis and design is complete? SELECT ONE OPTION
- A . Percentage of requirements linked to passed test cases.
- B . Number of testability defects found in the requirements.
- C . Number of test cases automated versus planned.
- D . Number of product risks covered by test conditions.
Which of the following describes the Failure Mode and Effect Analysis (FMEA) risk analysis technique? SELECT ONE OPTION
- A . FMEA is a quality risk management technique concerned with quality risks that arise from an incorrect understanding of the customer requirements.
- B . FMEA is an analytical process upstream, that attempts to identify the hazards for each risk.
- C . FMEA is where quality risks, their potential causes and their likely effects are identified and then severity, priority and detection ratings are assigned.
- D . FMEA is a risk mitigation process that involves determining every possible type of failure, and designing tests to cover each one.
Which of the following are Test Closure activities?
a. All results lodged in configuration management system – for example test plans, results, logs, reports.
b. Plans in place for lessons to be learnt to ensure that good practices are repeated and poor practices are not.
c. Checks undertaken to ensure that all test work is completed – all tests executed or skipped, all defects managed to appropriate conclusion.
d. All project closure activities completed – for example customer training completed, and analysis of vendor performance undertaken.
e. AM testing work products delivered to those that need them – for example environments/ regression test sets passed to maintenance.
f. Checks undertaken to ensure that all tests have been executed, with all defects confirmed as fixed by retesting.
SELECT ONE OPTION
- A . a, c, d and f.
- B . a, b, c and e
- C . a. b, e and f.
- D . b, c. d and e.
Which two of the following activities would normally occur in the Acquisition stage of a tool’s lifecycle?
a) Assign a tool administrator to decide on best use of the tool
b) Establish a backup and restore strategy for the tool
c) Review other tools provided by the same vendor
d) Determine how the tool may be impacted by a change to the operating environment
e) Develop and implement a training plan for new users of the tool
SELECT ONE OPTION
- A . c and e.
- B . a and b.
- C . a and e.
- D . b and d.
SCENARIO 3
You are the Test Manager for a software house called "MakeMyApp" that specialise in mobile phone applications, agile techniques are used for all software development projects.
A new project is underway to develop enhancements to a ‚photo sharing‘ application, known as ‚PictureFriend‘. There are two types of user account available -Premium Users and Guest Users. Guest users only have limited functionality available.
The enhanced features to PictureFriend are:
• Feature 1: Guest Users can share photos with other Guest Users and Premium Users;
• Feature 2: Premium Users can edit pictures before posting to their account;
• Feature 3: Premium Users can create ‚3D-effect‘ photographs
The requirements for each feature will be broken down into a number of User Stories with acceptance criteria created for each of them. User Stories are planned and delivered in 2-week ‚Sprints‘. The project will have 3 sprints.
Refer to SCENARIO 3
You have been asked to select an appropriate review type and review remit for the project.
Which of the following is the BEST review type and remit for this project? SELECT ONE OPTION
- A . Walkthroughs will be used to review all acceptance criteria and design documentation. The first review will take place after the final sprint.
- B . Informal reviews will be used to review the test risks and test plans. Review comments will be recorded in a document for consideration by the Product Owner,
- C . Informal reviews will be used to review acceptance criteria and design documentation. The artifacts will be reviewed and updated during each sprint.
- D . Inspections will be used to review the acceptance criteria and software architecture. Review comments will be recorded in a document where each will be marked as closed once addressed.
As a Test Manager, which one of the following do you think is the MOST important reason for ensuring effective processes are in place for test monitoring and reporting? SELECT ONE OPTION
- A . It allows for easier and more effective evaluation of exit criteria
- B . Reporting numbers of defects shows how effective the test team are.
- C . keeps stakeholders informed and prevents lots of meetings.
- D . The test report determines if a system can be deployed to live.